EC/ECTBoilersSeriesOilInstallation,Operation &MaintenanceManualAs an ENERGY STAR®Partner, PB Heat, LLC has determined that certain firing rates of
8E. TANKLESS HEATER OR COVERPLATE1. If a tankless coil is used (item 13 or 17), install aspictured. On water boilers, install in opening in frontsecti
9F. CONTROLS1. Water Boiler Controls:Install the limit / operating control, pressure-temperature gauge and safety relief valve. See Figure7.1 (Section
10A. GENERALAll electrical wiring shall be done in accordance with theNational Electrical Code and Local Requirements. Singlepole switches including t
11Figure 4.3: Steam Boiler with Probe Low Water Cut-OffFigure 4.2: Steam Boiler with Float Low Water Cut-OffELECTRICAL
12ELECTRICALFigure 4.5: Zoning with CirculatorsFigure 4.4: Water Boilers
13ELECTRICALFigure 4.6: Zoning with Zone ValvesFigure 4.7: Partner with Circulator
14BURNER SETUP & BOILER OPERATIONA. BURNER INSTALLATION1. The oil burner is supplied with a mounting flangefixed in position.2. Mount the burner t
15BURNER SETUP & BOILER OPERATIONE. CLEAN THE BOILER(STEAM BOILERS ONLY)1. Clean the boiler within one week after initial start-up.Cleaning will b
16BURNER SETUP & BOILER OPERATIONCARLIN BURNER SPECIFICATIONSBoiler Model No.Firing RateBurner Model No.Air ShutterNozzle SizePump PressureStart-u
17MAINTENANCE6. MAINTENANCEWARNINGProduct Safety InformationRefractory Ceramic Fiber ProductThis appliance contains materials made from refractory cer
USING THIS MANUAL 1A. INSTALLATION CLEARANCE . . . . . . . . . . . . .1B. SPECIAL ATTENTION BOXES . . . . . . . . . . . .11. PREINSTALLATION 2A. CLEA
18MAINTENANCEA. GENERAL1. Check pipes adjacent to cold walls or in unheatedspaces. Insulate and tape them if necessary to besure they can't freez
19MAINTENANCE3. Remove any scale or soot from the combustionchamber area by vacuum cleaning or any otheravailable means.4. Replace flue collector and
20BOILER DIMENSIONS & RATINGS7. BOILER DIMENSIONS & RATINGSTAPPING LOCATIONSLocation Size NPT Water SteamH 3/4" N/A Low Limit ControlI 3/
21BOILER DIMENSIONS & RATINGSTable 7.1: Boiler Ratings✸ As an ENERGY STAR®Partner, PB Heat has determined that these firing rates meet the ENERGY
22REPAIR PARTS8. REPAIR PARTSRepair parts are available from your installer or by contacting PB Heat, LLC, 131 S.Church, Bally, PA 19503.Note: Remembe
23NOTES
24NOTES
EC/ECTBoilersSeriesOilInstallation,Operation &MaintenanceManualTO THE INSTALLER:This manual is the property of the owner and mustbe affixed near t
1A. INSTALLATION CLEARANCEFollow the installation instructions provided in thismanual in the order shown. The order of theseinstructions has been set
2A. CLEARANCESUnit may be installed on combustible flooring, provided theboiler is not set on carpet and a metal drip pan is placedunder the appliance
3C. CHIMNEY / VENT AND DRAFT CONTROL1. Draft Requirement – Minimum draft required in thevent system is -.03" to -.05" W.C. depending onboile
4A. SETTING THE BOILER1. Provide a level foundation, located as close aspossible to the center of the heating system.2. Refer to Figure 2.2 for explod
5BOILER PLACEMENT AND ASSEMBLYFigure 2.2: Boiler Exploded View(See Table 8.1 in Section 8 for parts identification).
6A. PRESSURE TEST BLOCK ASSEMBLY1. Make up cold water supply connection to the boiler.2. Install pressure gauge or pressure-temperature gaugein tappin
7D. WATER BOILER PIPING1. Refer to the Water Installation Survey and HydronicsInstitute Residential Hydronic HeatingInstallation/Design Guide for Guid
Komentarze do niniejszej Instrukcji