PB Heat EC Series Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Grzejniki wodne i kotły PB Heat EC Series. PB Heat EC Series User's Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 27
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
EC/ECT
Boilers
Series
Oil
Installation,
Operation &
Maintenance
Manual
As an ENERGY STAR
®
Partner, PB Heat, LLC has determined that certain firing
rates of this product meet the ENERGY STAR
®
guidelines for energy efficiency.
Przeglądanie stron 0
1 2 3 4 5 6 ... 26 27

Podsumowanie treści

Strona 1 - Maintenance

EC/ECTBoilersSeriesOilInstallation,Operation &MaintenanceManualAs an ENERGY STAR®Partner, PB Heat, LLC has determined that certain firing rates of

Strona 2 - TABLE OF CONTENTS

8E. TANKLESS HEATER OR COVERPLATE1. If a tankless coil is used (item 13 or 17), install aspictured. On water boilers, install in opening in frontsecti

Strona 3 - USING THIS MANUAL

9F. CONTROLS1. Water Boiler Controls:Install the limit / operating control, pressure-temperature gauge and safety relief valve. See Figure7.1 (Section

Strona 4 - 1. PREINSTALLATION

10A. GENERALAll electrical wiring shall be done in accordance with theNational Electrical Code and Local Requirements. Singlepole switches including t

Strona 5 - PREINSTALLATION

11Figure 4.3: Steam Boiler with Probe Low Water Cut-OffFigure 4.2: Steam Boiler with Float Low Water Cut-OffELECTRICAL

Strona 6 - BOILER PLACEMENT AND ASSEMBLY

12ELECTRICALFigure 4.5: Zoning with CirculatorsFigure 4.4: Water Boilers

Strona 7

13ELECTRICALFigure 4.6: Zoning with Zone ValvesFigure 4.7: Partner with Circulator

Strona 8 - 3. PIPING AND CONTROLS

14BURNER SETUP & BOILER OPERATIONA. BURNER INSTALLATION1. The oil burner is supplied with a mounting flangefixed in position.2. Mount the burner t

Strona 9

15BURNER SETUP & BOILER OPERATIONE. CLEAN THE BOILER(STEAM BOILERS ONLY)1. Clean the boiler within one week after initial start-up.Cleaning will b

Strona 10 - PIPING AND CONTROLS

16BURNER SETUP & BOILER OPERATIONCARLIN BURNER SPECIFICATIONSBoiler Model No.Firing RateBurner Model No.Air ShutterNozzle SizePump PressureStart-u

Strona 11

17MAINTENANCE6. MAINTENANCEWARNINGProduct Safety InformationRefractory Ceramic Fiber ProductThis appliance contains materials made from refractory cer

Strona 12 - 4. ELECTRICAL

USING THIS MANUAL 1A. INSTALLATION CLEARANCE . . . . . . . . . . . . .1B. SPECIAL ATTENTION BOXES . . . . . . . . . . . .11. PREINSTALLATION 2A. CLEA

Strona 13 - ELECTRICAL

18MAINTENANCEA. GENERAL1. Check pipes adjacent to cold walls or in unheatedspaces. Insulate and tape them if necessary to besure they can't freez

Strona 14

19MAINTENANCE3. Remove any scale or soot from the combustionchamber area by vacuum cleaning or any otheravailable means.4. Replace flue collector and

Strona 15

20BOILER DIMENSIONS & RATINGS7. BOILER DIMENSIONS & RATINGSTAPPING LOCATIONSLocation Size NPT Water SteamH 3/4" N/A Low Limit ControlI 3/

Strona 16

21BOILER DIMENSIONS & RATINGSTable 7.1: Boiler Ratings✸ As an ENERGY STAR®Partner, PB Heat has determined that these firing rates meet the ENERGY

Strona 17 - (STEAM BOILERS ONLY)

22REPAIR PARTS8. REPAIR PARTSRepair parts are available from your installer or by contacting PB Heat, LLC, 131 S.Church, Bally, PA 19503.Note: Remembe

Strona 18

23NOTES

Strona 20 - MAINTENANCE

EC/ECTBoilersSeriesOilInstallation,Operation &MaintenanceManualTO THE INSTALLER:This manual is the property of the owner and mustbe affixed near t

Strona 21

1A. INSTALLATION CLEARANCEFollow the installation instructions provided in thismanual in the order shown. The order of theseinstructions has been set

Strona 22 - DIMENSIONS

2A. CLEARANCESUnit may be installed on combustible flooring, provided theboiler is not set on carpet and a metal drip pan is placedunder the appliance

Strona 23 - Series EC/ECT

3C. CHIMNEY / VENT AND DRAFT CONTROL1. Draft Requirement – Minimum draft required in thevent system is -.03" to -.05" W.C. depending onboile

Strona 24 - 8. REPAIR PARTS

4A. SETTING THE BOILER1. Provide a level foundation, located as close aspossible to the center of the heating system.2. Refer to Figure 2.2 for explod

Strona 25

5BOILER PLACEMENT AND ASSEMBLYFigure 2.2: Boiler Exploded View(See Table 8.1 in Section 8 for parts identification).

Strona 26

6A. PRESSURE TEST BLOCK ASSEMBLY1. Make up cold water supply connection to the boiler.2. Install pressure gauge or pressure-temperature gaugein tappin

Strona 27

7D. WATER BOILER PIPING1. Refer to the Water Installation Survey and HydronicsInstitute Residential Hydronic HeatingInstallation/Design Guide for Guid

Komentarze do niniejszej Instrukcji

Brak uwag